02

Contract manufacturing (CMO)

A validated assay design is transferred into our WHO-GMP production lines and manufactured at scale, with full lot documentation from the first batch.

Transfer begins with a joint gap analysis of your device master record against our line capability. Raw-material equivalence, incoming QC specifications and critical process parameters are agreed before the first engineering lot.

Once the line is qualified, production runs to your specification with in-process controls at each critical step. Every lot is released with batch records and a certificate of analysis. Stability programs support your registrations in each market.

Lot documentation: batch records · CoA per lot · stability data on request

You bring

  • Validated assay design and device master record
  • Raw-material specifications and approved suppliers
  • Release specifications and test methods
  • Forecast volumes and packaging requirements

We deliver

  • Joint gap analysis and technology transfer plan
  • Line qualification and process validation
  • Incoming QC and in-process controls to your specification
  • Lot release with batch records and CoA
  • Stability programs supporting your registrations

Discuss a technology transfer

Format, volumes and current manufacturing site are sufficient for an initial assessment.

All services →

Start a project

Describe your requirement. Our development team will respond with an initial feasibility assessment.

Request a quote

Product